PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Set Rebar along the footings at Elev. 7-Stair -4,5 Facing South -2 (800x600).jpg Set Rebar mats at Elev. 1,2,3 Facing South-East (800x600).jpg Water Penetration Test (Lower Section) -2 (800x600).jpg Water Penetration Test (Lower Section) (800x600).jpg Water Penetration Test Side view (Middle Section) (800x600).jpg Water Penetration Test Front view (Upper Section) (800x600).jpg Water Penetration Test at 10 lb.-sq. ft. (Upper Section) (800x600).jpg Water Penetration Test (Upper Section) (800x600).jpg Water Penetration Test at 10 lb.-sq. ft. (800x600).jpg
Previous pageNext page Water Penetration Test Side view (Middle Section) (800x600)
Water Penetration Test Side view (Middle Section) (800x600)